Programme Spécial National I Volet CES-DRS
Níger  
marzo 1993
Résumé du rapport d'évaluation intermédiaire Le PSN est constitué de trois sous programmes ou "volets" répartis dans cinq zones d'intervention ou "unités de terrain" (UT) très dispersées et...
Idiomas: English, French
Special Programme for SWC/AGF in the Central Plateau
Burkina Faso  
marzo 1993
Mid-term evaluation The project area covers four of the Central Plateau's seven provinces: Yatenga, Passoré (northern CRPA), Bam and Sanmatenga (north-central CRPA) and more precisely 12...
Second Small Farmer Development Project
Nepal  
marzo 1993
Completion evaluation Under the Second Small Farmer Development Project (SFDP II), the assistance given to small farmer groups (SFGs) was extended to a further 12 districts. At the same time,...
Agricultural Management Training in Africa (AMTA)
diciembre 1992
Interim Evaluation Agricultural Management Training in Africa (AMTA) Executive Summary A. Background 1. The Agricultural Management Training Programme for Africa (AMTA) was conceived by IFAD in the...
Proyecto de Desarrollo Rural Integrado Sur de Loja (1992)
Ecuador  
diciembre 1992
Evaluación preterminal resumen ejecutivo El área del proyecto corresponde a cuatro subáreas: Pindal, en la Cuenca del río Alamor, Catacocha, en la cuenca del río Catamayo, Sosoranga (río Sabiango),...
Idiomas: English, Spanish
Sao Tome et Principe: Second Artisanal Fisheries Development Project
Santo Tomé y Príncipe  
diciembre 1992
The project Introduction The USD 3.3 million Second Artisanal Fisheries Development Project was approved in December 1990 and became effective in April 1992. The IFAD loan amounts to SDR 1.2...
Minya Agricultural Development Project (1992)
Egipto  
diciembre 1992
Interim evaluation The Minya governorate constitutes a project area of 223 500 ha of which about 188 120 ha are under cultivation. The cultivated area is generally flat, with fine to medium...
West Beheira Settlement Project (1992)
Egipto  
diciembre 1992
Interim evaluation Background The project area consists of about 16 000 feddans and is located about 160 km North-West of Cairo. The topography is flat to gently undulating with soils that are...